Download AnyMedia Access System - Alcatel
Transcript
363-211-520 Battery Maintenance Procedures Fan Unit and Battery Maintenance Battery Maintenance Procedures Maintenance routines 11 The battery maintenance routines are classified into two categories: 3 Required (Table 11-1.) 3 Suggested (Table 11-2). Always follow the battery manufacturer’s recommended maintenance schedules procedures, which supersede the instructions provided in this chapter. NOTE: Failure to adhere to these maintenance schedules will void the warranty for IR-40EC batteries. NOTE: Battery maintenance procedures can interrupt the battery buffering for the ONU shelf and cause a shut-down of the complete ONU. Maintenance intervals for IR40EC batteries Use the manufacturer’s installation and maintenance record forms or the copies of the Installation and Maintenance Record provided in Appendix A. Maintenance intervals 11 The following maintenance intervals are mandatory for IR-40EC batteries. Table 11-1. Required maintenance intervals for IR-40EC batteries Routine 11-16 June 2002 Action Interval Battery string voltage Measure / record Quarterly Battery voltage Measure / record Quarterly Inter-battery connections Inspect Quarterly Clean (if necessary) As needed Inter-battery connections Retorque if the 14 AWG lead has been replaced As needed Battery string current Measure / record Battery temperature Measure / record External charging Charge only if required / record Optional or quarterly depending on the Maintenance Record used AnyMedia ONU Installation Manual: Outdoor, Issue 1