Operating Instructions
EC Motor Controller (ECMR)
The following minimum requirements must be met in order to commission the ECMR using the
“Start-up ECMR” software:
Processor:
Operating system:
Graphics card:
Resolution:
Drives:
Memory:
Interface:
Intel Pentium or higher
WINDOWS Vista, XP, 2000, NT, ME, 98, 95
Windows compatible, color
At least 800 x 600 pixels
CD drive
Hard disk (5 MB available) (software can be run from the CD)
At least 8 MB
Serial port RS232 (COM port)
The interface cannot be used by other software (e.g. drivers).
1.4
Proper use
1.4.1 ECMR controller
The ECMR controller is used for operating electrical automation components and belongs to the
scope of delivery. The ECMR (EC Motor Controller) is configured for the respective electrical
automation components before delivery.
Commissioning the ECMR is performed via the serial interface of a personal computer (PC) using
the “Start-up ECMR” commissioning software which has been provided.
Installation in systems for the proper use of the ECMR is prohibited until it can be determined that
the system conforms to EC Machinery Directive 89/392/EEC and the EC EMC Directive
(89/336/EEC). Adherence to EN 60204 and EN 292 is also required.
Concerning Low-Voltage Directive 73/23/EEC, the harmonized standards of the EN 50178 series in
connection with EN 60439-1, EN 60146 and EN 60204 are applicable to the ECMR. Adherence to
system thresholds required by EMC legislation is the responsibility of the manufacturer of the
system. Information about the EMC-compliant installation – e.g. grounding, handling sockets and
laying lines – is provided in this documentation.
The system manufacturer must submit a hazard analysis of the system and is responsible for the
functional, machinery-related and personnel safety of the system.
The ECMR is built into electrical systems or machines as a component and may be commissioned
only as an integrated component.
Prior to commissioning electrical automation components, all work must be performed according to
the operating instructions of the ECMR and of the concerned electrical automation components.
Safety regulations must be observed.
– Mounting, installation, wiring and final inspection must be performed as described
in the ECMR operating instructions.
– Mounting, installation, wiring and final inspection must be performed as described
in the operating instructions of the electrical automation components.