Figure 11 - Output for the Material-Handling System
5.4 Output for the Entire System
This sub-menu provides a summary of system operational performance measures, which
include:
•
material-handling system utilization,
•
expected total work-in-process,
•
average flow time and,
•
average tardiness.
The average flow time displayed here is the average over all products’ expected flow times. The
average tardiness is the average over all products’ tardiness. Figure 12 shows an example of this
menu.