Network Diagrams
ID
Duration
Legend
Slack
Start
Mechanical
Finish
7.21
24
7.22
10/14
0
Gear Design
11/16
7.1
11/17
34
10/14
12
2
Project Selection
0
8/22
16
4
Project Launch
9/6
9/7
0
11
9/28
9/29
0
12/6
30
Housing Design
0
10/14
11/2
8
System Design
0
7.23
14
Generator Selection
1
14
Turbine Design
Network Diagram: Fall
11/24
4
9
Integration Check
10/13
11/23
0
7.31
12/8
10
26
11/23
14
0
7.34
11/2
Electrical
0
12/4
Duration
Battery Life Indicator
Power Inverter
10/14
12
Waterproof Housing
10/27
7.33
0
7.35
Battery Selection
10/14
0
Interim Design
12/7
11/3
7.34
0
11/22
14
User Interface
10/28
ID
0
11/15
Duration
Legend
Start
Slack
Finish
Mechanical
1.11
14
Generator Testing
7
1/9
1/26
1.14
18
Assembly Housing
1.12
21
2/7
0
Network Diagram: Spring
3/1
Gear & Shaft
1/9
0
2/6
Critical Path
1.13
29
Turbine
1/14
8
2/22
3
21
System Integration
3/2
1.21
2
3/30
35
Charge Regulator
1/9
6
2/24
7
21
Final Report
1.25
18
3/27
0
4/24
Encasement
1/30
1.22
16
Power Inverter
1/9
0
1/28
8
1.24
2/22
6
18
1/30
8
1.23
4/5
2/22
18
User Interface
1/30
8
2/22
14
User’s Manual
Battery Testing
Electrical
0
4/24
4
14
Test & Modify
4/2
0
4/19
12/8