Download "user manual"

Transcript
4.2 Integrated development cycle
Once your development cycle is in place, you must make sure the code
developed can be integrated with other sources. The integrated development
cycle ensures this process. Figure 4-3 shows an example of an integrated
development cycle.
Figure 4-3 Integrated development cycle
The integrated cycle consists of a number of steps, which must be executed in a
specific order to ensure a consistent process. The following steps are the most
common ones you complete:
1. Develop custom code.
2. Export custom code from the development environment.
3. Import custom code back into the development environment for testing
purposes.
4. Commit custom code to the central version control system, ensuring a single
source for all code.
5. Schedule custom code for checkout each night.
6. Build custom code in the automated build environment.
154
Implementing IBM Tivoli Service Request Manager V7.1 Service Catalog