Download AC250 Installation Guide
Transcript
5° Flat Roof Mounting System Install Guide (60 & 72‐Cell V2 Modules) 5.2: Removing a Module Always tag out all breakers, fuse panels, and disconnections to prevent accidental energizing and possi‐ ble injury or death. Follow all of the safety precautions in Section 1.6 when servicing Modules. CAUTION: NEVER ATTEMPT ANY SERVICING OR REPAIR ON AN ENERGIZED ARRAY AS THIS COULD CAUSE SERIOUS INJURY OR DEATH. 1) Disconnect all wiring from the row with the Module being serviced. For DC Instant Connect Module, disconnect the MC4 connectors to the Junction Box. For AC Instant Connect Modules, discon‐ nect the interconnect cable to Junction Box. For the AC Module, disconnect the Andalay AC Kit to the Junction Box. 2) Remove all of the Modules from the row(s) above the Module being serviced. Follow the instructions in Sections 3.10 and 3.9 in reverse order. You must remove all Modules in all rows above the Module being serviced. 3) Remove the Modules in the row containing the Module being serviced. Follow the instructions in Section 3.8 in reverse order to remove all of the Modules in the row being serviced until you have removed the Module that requires service. 36 Copyright 2013, Andalay Solar