4. Commissioning
4.2
Commissioning tests
The valve terminal should be commissioned as follows:
Commissioning variants
Activity
Preliminary test of the
pneumatic tubing
Moving the valve-cylinder-combination by means of the manual override
Complete commissioning of
the complete system
Installing and connecting the complete system (all fieldbus slaves)
Program control via PLC/industrial
PC
Fig. 4/1: Commissioning variants
Commissioning by means of the manual override is described
below. Commissioning by means of program is described in
the relevant manual of the node.