Download User Manual

Transcript
Owner’s Project Requirements (OPR)
3. Owner’s Project Requirements (OPR)
Every time you enter the CxDocs application, the menu bar will be displayed with the OPR page
open, as this is where you begin to develop the commissioning documents. CxDocs guides you
through the progression of a project using a series of pages beginning with the OPR, moving
next to the BOD, and continuing left-to-right across the menu bar to the Cx Report. Each page
contains form fields where you enter information, save information, view and create documents.
Notice the Project Name is shown as it was entered when your new project was started. To edit
the Project Name, Click Edit and a dialog box will open where a new Project Name can be
entered. Click the check mark to save the New Project Name. Click the X to cancel.
The Owner’s Project Requirements details the functional requirements of a project and
expectations of how a building will be used and operated. These details include owner and user
requirements, project goals, equipment, building systems, occupants, building operation and
operation expectations, and supporting information. It is the responsibility of the property owner
or owner’s representative to assist in the development of this document and to review and
confirm that the contents of this document represent the owner’s project intent.
Information entered in the OPR page writes to several other pages and documents. The
CxDocs application requires items to be completed on the OPR page before moving to the
development of other pages within CxDocs application.
9
Copyright 2014 Cx Solutions