Download Evaluation Guideline

Transcript
12 Appendix 5 - Cross reference EN 54-4
Nr.
Subject
FEC
HUB
AMS
1.
2.
3.
3.1
3.2
4.
4.1
4.2
5.
5.1
5.2
5.2.1
5.2.2
5.3
5.3.1
5.4
6.
6.1
6.2
6.3
6.4
7.
7.1
7.2
8.
9.
9.1
9.2
9.3
Scope
Normative references
Definitions and abbreviations
Definitions
Abbreviations
General requirements
Compliance
Power sources
General requirements for indications
Power supply from the main power source
Power supply from the standby power source
Standby power
Battery
Charger
Charged automatically
Faults
Materials, design and manufacture
Manufacturer’s declaration
Mechanical design
Electrical design
Power supply interface
Documentation
User’s documentation
Design documentation
Marking
Test
General
Functional test
Test of the charger and the standby power
source
Test procedure
Requirements
Environmental tests
Cold
Damp heat , steady state
Impact
Vibration, sinusoidal
Electrostatic
Radiated electromagnetic interference
Voltage transients – fast transient bursts
Voltage transients – slow high energy
transients
Mains voltage dips and interruptions
Supply voltage variation
Damp heat , steady state
Vibration, sinusoidal
Special national condition
*
X
X
X
X
X
X
*
X
X
X
X
*
*
*
*
X
X
X
X
X
X
X
X
X
X
X
X
*
*
X
X
X
X
X
X
*
X
X
X
X
*
*
*
*
X
X
X
X
X
X
X
X
X
X
X
X
*
*
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
FEC
Standalone
*
X
X
X
X
X
X
*
X
X
X
X
*
*
*
*
X
X
X
X
X
X
X
X
X
X
X
X
*
*
*
X
X
X
X
X
X
X
X
X
*
*
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
*
*
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
9.3.1
9.3.2
9.4
9.5
9.6
9.7
9.8
9.9
9.10
9.11
9.12
9.13
9.14
9.15
9.16
Appendix
A
Appendix
ZA
Clauses of this European Standard
X
addressing essential requirements of the
Construction Products or other provisions of
EU Directives
Appendix
Procedure for monitoring of the battery
X
B
internal resistance required
* = Not within scope, this has been settled elsewhere in the directive.
Evaluation Guideline
© Kiwa N.V.
- 60 -
BRL-K21014/04
June15, 2009