Download Spec - Seashore Builders, Inc.

Transcript
Manufacturer's standard catalog data, at least 5 weeks prior to the purchase or
installation of a particular component, highlighted to show material, size, options,
performance charts and curves, etc. in adequate detail to demonstrate compliance with
contract requirements. Data shall include manufacturer's recommended installation
instructions and procedures. If vibration isolation is specified for a unit, vibration
isolator literature shall be included containing catalog cuts and certification that the
isolation characteristics of the isolators provided meet the manufacturer's
recommendations. Data shall be submitted for each specified component.
Spare Parts
Spare parts data for each different item of equipment specified.
Posted Instructions
Posted instructions, at least 2 weeks prior to construction completion, including
equipment layout, wiring and control diagrams, piping, valves and control sequences,
and typed condensed operation instructions. The condensed operation instructions
shall include preventative maintenance procedures, methods of checking the system
for normal and safe operation, and procedures for safely starting and stopping the
system. The posted instructions shall be framed under glass or laminated plastic and
be posted where indicated by the Contracting Officer's Technical Representative.
Verification of Dimensions
A letter, at least 2 weeks prior to beginning construction, including the date the site
was visited, confirmation of existing conditions, and any discrepancies found.
Coil Corrosion Protection
Product data on the type coating selected, the coating thickness, the application
process used, the estimated heat transfer loss of the coil, and verification of
conformance with the salt spray test requirement.
System Performance Tests
A schedule, at least 2 weeks prior to the start of related testing, for the system
performance tests. The schedules shall identify the proposed date, time, and location
for each test.
A schedule, at least 2 weeks prior to the date of the proposed training course, which
identifies the date, time, and location for the training.
SD-06 Test Reports
Refrigerant Tests, Charging, and Start-Up; G
P/N 05-C05124
Section 23 82 02 Page 261 of 367