Download chapter 2

Transcript
GE MEDICAL SYSTEMS
DIRECTION 2300000, REVISION 2
4-9-13
4-9-13-1
LOGIQ™5 SERVICE MANUAL
SMPS, HDD, ODD Assy function check procedure
SMPS Assy Test
1.) Turn on the system and check the completion of Echoloader loading.
2.) Check the system basic functions. Refer to Section 4-3-4 - System B/M-Mode Checks on page 47. Refer to Section 4-3-5 - System CFM and PWD Checks on page 4-9.
4-9-13-2
HDD Test
1.) Refer to Section 4-9-11-2 - Basic Function Test on page 4-50.
4-9-13-3
ODD Test
1.) Turn on the system and check the completion of Echoloader loading.
2.) Enter "Patient" Mode
3.) Select "Transfer" button and then Insert CD/DVD media which is included patient data. Execute
"Import".
Check display 'Success' message.
4.) Select "Transfer" button and then execute "Export". Insert empty CD/DVD media.
Check display 'Success' message.
5.) Execute "Ez back up". Insert empty CD/DVD media.
Check display 'Success' message.
4-52
Section 4-9 - Board Function Checks