Download SPARC Enterprise Equipment Rack Mounting Guide
Transcript
3.7.2 No. Parts Name Required Number 2 Middle-sized bracket Not used 3 Small-sized bracket 1 4 M5 screw 2 5 M5 cage nut 2 Safety Against Overturning 1. Take appropriate measures to prevent the rack from toppling over. For details, see Section 3.4, “Equipment Rack Mounting Requirements” on page 3-12. As an example, the procedure for attaching the quake-resistant options kit to the rack is shown below. FIGURE 3-67 Pulling Out the Pull-out Quake-Resistant Options Kit Stopper bracket Slide chassis Level foot End mark Caution – Be sure to pull the slide chassis all the way out to the point indicated by the end mark. If the slide chassis is not pulled all the way out to the end mark point, the equipment rack may topple over when drawing a server out from a rack. 3-80 SPARC Enterprise Equipment Rack Mounting Guide • September 2011