Download Display - Service, Support
Transcript
Communication Connections: RS-232C or RS-485 Description This section provides information for making connections to the NAU installed SYSCON RS-232C and RS-485 serial port connectors. See Figure 4 and Figure 5 for connector locations. Wall Mounted Unit Cable Compression Fittings Cables must be run through compression fittings installed in the bottom or side of the Conduit Connection Box. When the compression fitting is tightened, it will secure the cable and prevent it from being pulled out from its SYSCON connector. The compression fitting openings that are drilled into the box must be suitable for the size cables being run. The maximum line length is 3937 feet (1200 meters) for RS-485 and 49 feet (15 meters) for RS-232. Serial Port Cable Installation Procedures The following procedures should be followed when installing serial port data cable: 1. Before installing RS-232 and/or RS-485 connector(s), turn NAU AC power OFF. 2. Feed serial cable through the compression fitting, leaving sufficient cable length within the Conduit Connection Box, leave enough cable to allow connecting of RS-232C and/or RS-485 connector and to remove cable tension; tighten fitting. 3. Plug RS-232-C and/or RS-485 connector in appropriate SYSCON serial port connectors (for SYSCON2, refer to the database to determine which connectors are configured as RS-232 and which are RS-485). 4. Turn NAU AC power ON. 2000581-001 Installation - 23