Download Operator`s Manual
Transcript
Operator's Manual Second Edition • Third Printing PRE-OPERATION INSPECTION Pre-operation Inspection o Be sure that the operator's, safety and responsibilities manuals are complete, legible and in the storage container located on the platform. o Be sure that all decals are legible and in place. See Decals section. o Check for hydraulic oil leaks and proper oil level. Add oil if needed. See Maintenance section. o Check for battery fluid leaks and proper fluid level. Add distilled water if needed. See Maintenance section. Check the following components or areas for damage, improperly installed or missing parts and unauthorized modifications: o Electrical components, wiring and electrical cables o Hydraulic power unit, tank, hoses, fittings, cylinders and manifolds o Pothole guards o Platform extension o Scissor pins and retaining fasteners o Platform control joystick o Generator (if equipped) o Counterweight (if equipped) Check entire machine for: o Cracks in welds or structural components o Dents or damage to machine o Be sure that all structural and other critical components are present and all associated fasteners and pins are in place and properly tightened. o Side rails are installed and bolts are fastened o Be sure that the chassis trays are in place, latched and properly connected. o Battery pack and connections o Drive motors o Wear pads o Tires and wheels o Ground straps o Limit switches, alarms and horn o Nuts, bolts and other fasteners o Platform entry chain (if equipped) o Platform entry gate (if equipped) o Beacon and alarms (if equipped) o Brake release components o Safety arm Part No. 82681 Genie GS-2046 and Genie GS-2646 and Genie GS-3246 13