Download GTU C 330
Transcript
Positioning of the baffle plates The first two baffle plates in the 2 lower flue ways are fitted with stops allowing them to be positioned in the required emplacement. (1) Stop Boilers for following countries: France, Germany, Belgium, Switzerland, Spain, Austria, Poland, Slovenia, Czech Republic Baffles Upper Lower Flue ways GT... 334 - Length: 410 mm A+B - Length: 570 mm A+B 4 - Length : 412 mm C 2 - Length: 572 mm C GT... 335 GT... 336 GT... 337 8 8 4 2 2 GT... 338 GT... 339 4 8 8 2 4 2 2 Boilers for following countries: Canada, China, Greece, Romania, Tunisia, United States, Russia Baffles Upper Lower Flue ways GT... 334 - Length: 410 mm A+B - Length: 570 mm A+B 4 - Length : 412 mm C 2 07/04/2009 - 300016152-001-C GTU C 330 GT... 335 GT... 336 8 8 2 2 GT... 337 GT... 338 GT... 339 4 4 4 2 2 2 35