Download LEGEND SE
Transcript
OPERATION FREEZING PROTECTION 7. If the unit is exposed to freezing weather the water in the unit may freeze, causing SERIOUS DAMAGE to the unit. To avoid this, the following is recommended during the cold weather season: Turn the water pump switch OFF. Attach the winterizing loop hose with attachment, Part #10-805380, to the solution outlet connection and the water inlet connection. Turn the water pump switch ON. WINTERIZING LOOP HOSE ASSEMBLY, #10-805380 When the unit is not in use, always park it in a heated building. While in operation, avoid long shutdowns as the unit provides heat while running. Shut it down just prior to leaving for the next job. LOOP HOSE If a heated building is not available, we recommend that you winterize the unit with anti-freeze. At present, it is only possible to winterize units which do not have an auxiliary water tank. Units with auxiliary water tanks must be stored in a heated building when not in use. ATTACHMENT Allow the unit to run for approximately 3 minutes with the winterizing loop hose attached. ADDING ANTI–FREEZE TO YOUR UNIT: 1. Shut off the water supply. Disconnect the water inlet hose from the front of your console. 2. Connect all high pressure hoses and tools that may have water in them. 3. Fill the water box with approximately two gallons of 100% glycol base anti-freeze. 4. Start the unit , turn water pump off and open the tool valve pressure drops and water stops lowing. 5. Turn the water pressure override switch to the override position and start the unit. Turn the water pump switch ON. 6. Open the tool valve until anti-freeze begins to come out of the tool. Recover ALL anti-freeze that comes out of the tools into an approved container. We strongly recommend that you recycle and re-use the anti-freeze. 8. Prime the chemical system with a 50/50 antifreeze/water mix. Insert the chemical inlet and prime tubes into the anti-freeze container. Turn the chemical valve to PRIME until antifreeze begins to flow out of the prime hose. Now turn the chemical valve to the ON (CHEMICAL) position, making certain that the flow meter indicates flow. Make certain that all anti-freeze drains out of the chemical hose into an approved container. After 20 seconds, turn the chemical valve to the OFF position. 9. Open the heat bypass valve by turning the knob counter-clockwise. After 10 seconds, close the heat bypass valve. Hold switch in override position for 10 seconds. 10. After completing these procedures, shut the unit down. The unit is now “winterized”. Repeat this procedure with all the remaining tools. After all tools and pressure hoses have been filled with anti-freeze, disconnect and store them. Close the heat bypass valve by turning the knob all the way clockwise. 3-23 LEGEND SE 980059 06/19/03