For the majority of Small Load connections, we will provide a fixed-price quotation of connection charge including (permitted connection Fees) within 10 working days once we have received all the require information from you. Once you have accepted the Connection Offer and paid the connection charges, we will agree an installation date with you, which will usually be scheduled within 3 month unless you ask for a late date. 3.2.1.2 Large Load Connections If the connection requires a capacity of more than 60kW, it will be classed as a Large Load connection. We will provide a fixed-price quotation of connection charge including (permitted connection Fees) within 10 working days once we have received all the required information from you. Once you have accepted the Connection Offer, we will finalise the design, obtain any necessary way leaves and agree an installation date with you, which will usually be scheduled within 3 months from the date of obtaining the necessary approvals and way leaves unless you ask for a later date. 3.2.1.2.1 The Large load connections are categorized into two: Non-commercial: this category includes Residential buildings of 4 flats or below and any public use connections such as mosques, social gathering places (Majlises)...etc. If your connection is of this category you will be required to pay only 50% of the predetermined Charge per kW (2006 charges are stipulated in Annex B) Commercial: this category includes Commercial, Industrial, Government, residential building with more than 4 flats, farms, hotels & Tourism and any other connections not classified as non commercial connections. If your connection is of this category you will be required to pay 100% of the predetermined Charge per kW. (2006 charges are stipulated in Annex B) 8