Download Stenner Basic Service Manual
Transcript
6 Installation Spill Recovery In case of tube rupture, chemical drains back into solution tank, preventing spillage on the ground/floor and keeps chemical from collecting in tube housing. Vertical Wall Installation This type of installation is recommended by factory to keep chemical away from pump parts.