Download Service Manual - Precision Temp
Transcript
PT-200 & PT-56 Installation and Service Bulletin Contents • • Parts and Labor Warranty Warranty Policy Procedure • • • • • • • • • • • • Introduction PT-200FT Design and Sequence of Operation PT-200RC Design and Sequence of Operation PT-56 Design and Sequence of Operation Reference Component Illustrations Control Board Layout Illustration PT-200FT Troubleshooting Guide PT-200RC & PT-56 Troubleshooting Guide PT-200FT Electrical and Plumbing Schematics PT-200RC &PT-56 Electrical and Plumbing Schematics PT-200FT Service Codes PT-200RC & PT-56 Service Codes • Service Bulletins and Charts o SB-1 12 Volt Power Supply Change Procedure o SB-1A 24 Volt Power Supply Change Procedure o SB-2 Pressure Switch Adjustment o SB-3 Circuit Board Replacement o SB-5 Igniter Change and Spark Gap Adjustment o SB-6 Direct Spark Ignition (DSI) Board Change o SB-7 Automatic Calibration (AutoCal) Procedure o SB-8 Modulating Valve Replacement o SB-10 Changing Outlet Temperature Setting o SB-11 Fan Relay o SB-12 Combination Gas Valve Replacement o SB-13 Flow Meter Check and Replacement o SB-14 Burner Manifold Pressure Check and Adjustment o SB-15 T-Mid Thermistor Change Procedure o SB-16 T-Out/ T-In Thermistor Change Procedure o SB-17 Thermistor Reading Procedure o SB-18 PT-56 Tank Replacement o SB-19 PT-56 Pump Replacement o SB-20 PT-56 Testing Procedure • • • • • Thermistor Calibration Chart Replacement Parts List Preventative Maintenance Schedule Installation Manual Factory Authorized Startup Procedure Rev 8/2014 PrecisionTemp, Inc • 11 Sunnybrook Drive • Cincinnati, Ohio, 45237 • 1-800-934-9690 • fax 513-641-0733 3