Download World Bank Document
Transcript
6. Sustainability 6.1 Rationalefor sustainability rating: FID is a strong institutionwhich has demonstratedits ability to managea growing program throughout Madagascarwith competentstaff and efficient operating procedures. The requests by the Governmentfor continuingphases of FID involvementare furtherevidence of the viabilityof FID. There has also been considerableimprovementin the capacity of local contractorsand consultingfrms. However,these gains are not likelyto be sustainablewithout continued externalfunding. Maintenanceproblemswere noted duringthe SECALINEproject and during FID II. A 1998survey indicatedthat maintenanceproblemswere particularlyevident in rural roads but much less evident in the case of small irrigationprojects. FID and the Bank have carried out an increasingeffort to ensure the properuse of new facilitiesandto improvecommunityinvolvementto enhanceprospects-formaintenance and sustainability. At the mid-termreview of FID/SECALINEin 1996 a strategywas developedto make beneficiariesmore responsiblefor infrastructure. Five percent up-front depositswere required from communitiesto ensure long-termcommitment.NGOs and consultingfirmswere involvedto a much greater extentto build awarenessabout maintenanceissues. Maintenancemanualswere requiredfor all sub-projects. Local governments(communes), newlyelected under governmentdecentralizationpolicy, were asked to make budgetprovisionsfor operation and maintenancein advanceof works. It was decided that communitieswould not be eligiblefor furtherFID financing if maintenancewas not undertaken. The need to focus on maintenancewas again stressedby supervisionmissions during 1998and at the Mid-term reviewin October 1998. It was agreedthat communitiesprovidinga commitmentof more than 5% would be given priorityfor new sub-projects,and tolls would be chargedfor rural roads. Community commitmentwould be encouragedeven more stronglyby a proposedfuture operationwhich will enable communitiesto undertakemany types of works directly. After the mid-termreview, a large maintenancesupportprogram was launched in 1998 aimedto: (a) inspectthe maintenanceof projectsfinished beforeDecember 1997;(b) improve the promotionof maintenancewith beneficiariesthrough technicalassistance;and (c) elaborate an improvedmaintenance strategy for FID projects. The survey indicatedthat 49% of sub-projectsstill under contractors'guaranties were consideredpoorlymaintainedand another21% were only moderatelywell maintained. These figures improvedto 35% poorly maintainedand 29% moderatelymaintainedafter consultantsvisited the sites again. Sub-projectswhichhad been turned over to communitieswere better maintained(47% poorlyand 32% moderately before consultants'visits and 26% poorly and 28% moderatelyafter consultants'visits). Despite improvementsafter FID efforts, the results indicatethe difficultyof the maintenanceissue. Problems in the staffing of health centers and schoolsalso suggestsustainabilityproblems (see section6.2). However,FID's consistenteffortsto face these problemsgives some optimism that better resultscan be achieved in the future. 6.2 Transition arrangement to regular operations: Agreementswere made with sector ministriesthat schoolsand health centerswill be properly staffedand FID has entered into Protocoles d'accord with them. RegionalConsultativeCommittees(CCRs) which have representationfrom sector ministriesand concemedNGOs have also approvedprojectsand made staffing commitmentsbefore appraisal. However,there,havebeen consistentproblems in staffimghealth centers by the Health Ministry. At the time of the mid-tenr reviewmany facilitieswere not properly staffed. In the 1999beneficiariessurvey, insufficientpersonnelwas cited as a problem in 9 out of 10 health centers. This problem also existed for schools,but was less severe (6 of 16 schoolshad insufficient -7-