Download warning - Pioneer Family Pools
Transcript
Page 24 ENGLISH Zodiac® Nature2® Fusion Soft | Installation and Operation Manual When 24 Volts AC is applied to the ORP 24 VAC inputs, chlorine production will be disabled. The front panel of the power supply will then flash “EC” (external control). Once the 24 Volts AC input is removed the chlorine generator will return to normal operation. The “EC” will be replaced with the current production setting of 0% to 100%. POS-2 Wait at least one (1) minute after applying power. See note 1. Placing the jumper in POS-2 allows the chlorinator to operate in the opposite way to POS-1. With 24 Volts AC applied to the ORP 24 VAC inputs, chlorine production will be enabled. The front panel of the power supply will display a production rate of 0% to 100%. When the 24 Volts AC is removed the chlorine generator will flash “EC” every few seconds and chlorine production is disabled. SUMMARY POSITION OF J14 24 VAC 0 VAC POS-1 (default) Unit OFF, displays EC Unit ON, displays 0-100% POS-2 Unit ON, displays 0-100% Unit OFF, displays EC Note 1 The unit samples the external control/ORP settings at the instant power is applied to the chlorinator and will not respond to any changes during the first minute of operation. The unit may appear to be STUCK IN or STUCK OUT of “EC” mode. Wait several minutes until the unit has warmed up to verify the changes made to external control set-up. Note 2 Unlike the previous production models with ORP control, multiple chlorinators can be linked together to be controlled with one ORP controller without the use of external relays and transformers. Contact the factory for more information. Wires to the external ORP Controller ORP Connector J15 R0474300 J2 ORP Jumper J14 J2 Figure 16. Movable ORP Jumper J14 Chlorine Generator Power Interface Board