Download E 4040

Transcript
ENGLISH
5.1.3_ Safety fastening
- If the bolt button is pressed, the carriages go down to the first available bolt (max step:
100mm.
CAUTION
This operation must be carried out before accessing the work area after
each rise.
5.1.4_ Platform levelling
WARNING:
At each cycle make sure that the cables are tightened and the platforms are synchronised.
WARNING:
The cables are fitted with a device that detects their loosening.
If one or both cables are loosened, this device activates automatically the mechanical safety devices.
No operati
31