Download Hybrid Model User Guide
Transcript
Go to the model map. Use the model map to move to the relevant worksheet to see or alter the input values. The consolidation model can be opened to obtain the results. Note that the two models should be in the same directory. If this is the case and the file names are unchanged, then the Excel links from consolidation to core model will work. If not, you will need to edit links and alter the filenames or directory names. The recommended approach to gaining an understanding of the model is to work through each sheet in turn, starting with inputs, moving to calculations and then outputs. One way to improve understanding is to edit the input data, recalculate and investigate the effect of the changes on the results. The access model is considerably larger and hence more complicated to navigate and understand from a spreadsheet point of view than the other models. Therefore a large part of the user guide facilities has been included in the actual model for ease of use. This guidance has not been duplicated in this document. The Hybrid Access Model does allow the user to model FWA in the access network. Due to the negligible use of FWA in TeliaSonera’s access network, the hybrid model does not deploy FWA in the access network. Therefore the user guide does not include description of the FWA component. Users are inclined to refer to the descriptions found inside the model itself. 4.3.2 Inputs Each sheet has a title that reflects its contents. 4.3.2.1 I_Cost_Copper This sheet contains data on the unit costs of copper cable in the access network. Table 1 provides figures on the cost of copper cable per km, which are provided separately for cable on poles vs. cable buried underground. Table 2 contains information on the amount of over provisioning of cable installed by the operator in order to provide redundancy in cause of faults and extra capacity for future use. The table also provides input for any other cable cost if they exist. Changes to this sheet will primarily affect the pr km cost of copper pairs as calculated in the per unit cost calc sheet C_LRAIC_cost_per_unit which is used in the calculations in sheets C_Copper_Cabling and C_Copper_Nodes. 4.3.2.2 I_Cost_Fibre This sheet contains data on the unit cost of Fibre cables. Tables 1-2 contain the pr km cost of fibre cables and submarine fibre cables including price trend, maintenance and asset life. Changes to this sheet will primarily affect the pr km cost of fibre as calculated in the per unit cost calc sheet C_LRAIC_cost_per_unit. Post- och telestyrelsen 28