Download CAISO SIBR System Coordinator User Guide
Transcript
SIBR – Scheduling Coordinator Users Guide Version: 5.0 Date: 11/4/2014 RUC participation, and c) gross versus net settlement. Minimum Daily Energy Limit The minimum Energy scheduled and dispatched from a Generating Resource within a Trading Day; it is used to specify maximum pumping Energy for PSH units. Minimum Daily Generating Energy Limit The minimum net Energy produced by a NGR within a Trading Day. Minimum Daily Load Energy Limit The minimum net Energy consumed by a NGR within a Trading Day. Minimum Down Time The minimum duration that a Generating Resource must stay off from a given Online Generating Resource State after a State Transition from that State onto another Generating Resource State (including the Offline Generating Resource State). Minimum Energy Bid Segment Size The minimum required size of any Energy Bid Segment in a Virtual Resource Energy Bid Component. Minimum Gen-to-Pump Down Time The minimum duration that a PSH must stay Offline between generating and pumping operations. Minimum Hourly Block The minimum number of consecutive Trading Hours that an Inter-Tie Resource must be scheduled, if at all. Minimum Load The minimum sustained Operating Level of a Generating Resource. Minimum Load Cost The Operating Cost of a Generating Resource operating at its Minimum Load. Minimum Load Cost Basis A Generating Resource option (applicable to all MSG configurations) that indicates the basis of the MLC determination: Registered Cost: The MLC is registered. Proxy Cost: The MLC is bid, but it cannot be higher than an approximation of the actual MLC. Minimum Load Cost Bid Component A Bid Component for Minimum Load Cost. Minimum Load Fuel Cost The cost of the fuel consumed by a Generating Resource operating at its Minimum Load. Minimum Load Reduction The discrete Load Reduction of a Participating Load Resource below its Base Load. Page 134