Download CAISO SIBR System Coordinator User Guide
Transcript
SIBR – Scheduling Coordinator Users Guide Version: 5.0 Date: 11/4/2014 Energy. Maximum Capacity The maximum sustained Operating Level of a Generating Resource. Maximum Daily Energy Limit The maximum Energy scheduled and dispatched from a Generating Resource within a Trading Day. Maximum Daily Generating Energy Limit The maximum net Energy produced by a NGR within a Trading Day. Maximum Daily Load Energy Limit The maximum net Energy consumed by a NGR within a Trading Day. Maximum Daily Start-Ups The maximum number of Start-Ups allowed for a Generating Resource within a Trading Day. Maximum Energy Curve Segment Number The maximum allowed number of Energy Bid Segments in Submitted Bids. Maximum ETC Self-Schedule Quantity The maximum ETC Self-Schedule Quantity allowed for a Resource. Maximum Export Capacity The maximum export capacity at a Virtual Demand Resource Location that is an Inter-Tie Scheduling Point. Maximum Generating Capacity The maximum generating capacity at a Virtual Supply Resource Location that is not an Inter-Tie Scheduling Point. Maximum Import Capacity The maximum import capacity at a Virtual Supply Resource Location that is an Inter-Tie Scheduling Point. Maximum Load Capacity The maximum load capacity at a Virtual Demand Resource Location that is not an Inter-Tie Scheduling Point. Maximum Load Drop Rate The maximum rate at which a Participating Load Resource can decrease its electric power consumption. Maximum Load Pick-Up Rate The maximum rate at which a Participating Load Resource can increase its electric power consumption. Maximum Load Reduction The maximum Load Reduction that a Participating Load Resource is certified for. Maximum Load Reduction Initiation Time The maximum time required for Load Reduction Initiation after a Load Reduction Initiation Page 132