Appendix B - Quick Reference (Contractor Connected)
Job Type
Examples
Metering of Supply
Type of Supply
Consumer Mains
Terminate at
Disconnection/ Reconnection of
existing metered
supply
1 phase to 3 phase
Changeover
If no change needed to current
meter use Existing meter
Please use the current type
of supply.
New consumer mains
etc.
If a replacement meter is used e.g.
1ph to 3ph use Existing Meter
replaced
The option chosen should
reflect where the mains will
be connected at the
completion of the work on
this Notice.
New connection
Connecting a new meter
to the network (must
have a new retailer
account)
Choose New Meter to be Installed
by this Electrical Contractor
Choose the Western Power
supply type that is available
for the site.
The option chosen should
reflect where the mains will
be connected at the
completion of the work on
this Notice.
Builder’s supply
pole (Creating a
new one)
Treat these as a new
connection and use your
company address
Choose New Meter to be Installed
by this Electrical Contractor
Relocating a
portable builder’s
supply pole
Use the company
address
Choose Existing meter
Choose the Western Power
supply type that is available
for the site
The option chosen should
reflect where the mains will
be connected at the
completion of the work on
this Notice.
In your Preliminary Notice
comments, supply the
address where the builders
supply pole has been
installed.
Page B-2