Download INSTALLATION & OPERATING INSTRUCTIONS
Transcript
INDEX (continued) Page Section 7 - ELECTRICAL INSTALLATION CONSIDERATIONS 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 Connecting Cables Paralleling Connection Preparation Torqueing Connections Connection Check Battery To Charger Connection Connection Resistance Cell Numerals Section 8 - INITIAL CHARGE 8.0 Constant Voltage Initial Charge Section 9 - OPERATION 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 Float Charge Float Voltages Voltmeter Calibration Recharge Determining State of Charge Effects of Temperature Effects of Float Voltage Ohmic Measurements Section 10 - EQUALIZATION 10.0 10.1 Equalizing Charge Equalizing Frequency 5 5 5 5 6 6 6 7 7 7 8 8 9 10 10 10 11 12 12 12 Section 11 - MAINTENANCE SCHEDULE 13 Section 12 - TAP CONNECTIONS 13 Section 13 - TEMPORARY NON-USE 13 Section 14 - UNIT CLEANING 14 Battery Maintenance Report Template ii