Download TimeQuest User Guide

Transcript
The setup relationship is 5ns, which is the value entered for the set_max_delay
assignment. Data Required Time uses all the delays through the FPGA, which can be seen going
down the Location column, from the clock entering on Pin_N3, through the IO buffer and PLL,
the global clock tree G10, the output FF, IO Output Buffer and finally Pin Y11. This all takes
3.520ns. The Data Required Path is outside the FPGA, and just has the latch edge time of 5ns,
which is our requirement. The external delay oExt is 0ns, which means the external delay has no
affect. So our requirement is 5ns, our delay through the FPGA is 3.520ns, and we meet timing
by 1.480ns. Another way of stating this is that the Tco is 3.520ns and meets our requirement by
1.480ns. In this case, using set_max_delay 5.0 to our output port analyzed the path the same way
as a Tco requirement of 5ns would have. Everything looks good.
64