Download SUPPLEMENTARY OPERATING INSTRUCTIONS
Transcript
1 0 EASTERNREGION SECTIONAL APPENDIX —NORTHERN 0 AREA — continued LOCAL INSTRUCTIONS — continued Page 311 — continued CASTLEFORD STATION TO ALLERTON MAIN (BOWERS Oi'ENCAST) CASTLEFORD OLD STATION Delete existing instruction and Add:WHELDALE COLLIERY Working of trains to the Colliery Trains arriving at Castleford Old Junction requiring to enter Wheldale Colliery Sidings must be shunted to the Branch line to clear the Main Lines as expediously as possible. Should the train when arriving inside the Branch to Up Main Home signal (No.10) be foul of the ground frame connection to Wheldale Colliery the Signalmen at Castleford Station box must be requested to clear the subsidiary signal to the East Branch shunt neck to obtain the necessary headroom. When requesting the release for the Wheldale Ground Frame the guard must ascertain from the Signalmen into which siding the train must be positioned and receive an assurance that no NCB conflicting movement is being made. Working of trains from the Colliery Before any train is propelled in the sidings towards the siding outlet, the Guard must obtain the permission of the Signalmen at Castleford Station box by use of the telephone located at the ground frame. Page 312 (Page 123 Supp. No.1) WAKEFIELD (KIRKGATE) EAST TO GOOLE GOODS JUNCTION SHARLSTON SHARLSTONCOLLIERY RAPID LOADING FACILITIES Delete the following sentence:— The Guard will ascertain that the points are in the correct position for the loadinq operation and advise the Bunker operator. Page 314 GOOLE DOWNFREIGHT TRAINS Amend 'Boothferry Road' in last line to read 'Goole' WATH ROAD JUNCTION TO BURTON SALMON MOORTHORPE FRICKLEY COLLIERY — Loaded and Empty Wagon Sidings Delete from the 3rd line of the first paragraph :— "and the Frickley Colliery Branch at the lower end" Page 315 FRICKLEY COLLIERY SIDINGS —WORKING OF BUNKER LOADED TRAINS Delete the following sentence from the first paragraph:— The Guard will alight at the Bunker installation and ascertain that the points are in the correct position for the loading operation and advise the Bunker operator. Page 315 (Page 127 Supp No.1) FERRYBRIDGE C.E.G.B. Add:Working Manual for Rail Staff (BR.30054), pink pages, clause E2/17 (a) is amended as follows:Paragraph 3 does not apply. Certificate of Readiness — The guard must hand the orginal completed certificate to the C & IN examiner. Pages 315/316 FERRYBRIDGE 'C' POWER STATION Delete : first to fifth paragraphs inclusive also paragraph nine. Amend reference in tenth paragraph to — Signals 4 0 a n d 4 1 t o