Download Plant Sciences' Sputter Coater E5000 Operating Instructions 1

Transcript
Plant Sciences’ Sputter Coater E5000
Operating Instructions
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
OPEN Argon tank with key (anticlockwise)
Ensure tank is open to 5 psi
Place specimens in chamber
Turn operation switch to PUMP – chamber will pump to 0.07 Torr
OPEN LEAK VALVE 1 revolution ANTICLOCKWISE and quickly CLOSE again
When gauge returns to 0.07 Torr, REPEAT step 4.
Turn operation switch to SET HT
Set HT CONTROL to 1.2 kV
OPEN LEAK VALVE slowly ANTICLOCKWISE to 40 mA
Turn operation switch to TIMER.
Set TIMER to 2 minutes by depressing knob and rotating CLOCKWISE
Activate TIMER by pressing black button
When coating is finished:
set LEAK VALVE to 0
turn HT CONTROL to OFF
Turn operation switch to OFF
Bleed chamber by lifting valve in top plate
Remove specimens
CLOSE Argon tank with key (clockwise)
© Bio-Imaging, SWDSOP, 2004