Download Installation & Operating Instructions

Transcript
Assembly
Your stove will be delivered in separate crates containing the steel boiler, cast parts and
the internal firebricks. The diagram below gives an overview of the entire assembly
process, however more detailed information is given on each section (base, body and
internals).
Assembly of the Snowdon 26 consists of 5 stages:
1)
2)
3)
4)
5)
Prepare the base
Prepare the body
Install the body onto the base
Install the lid, spigot and seals
Install the internal parts
MS10-11C Issue 3
10