15 14 13 12 11 10
9 8 7 6
5
4
3
2 1
5.4.3.1 Connections between HumSpots
The HumSpot has electrical control of only the group of atomisers in question. These
are powered by the HumPower during atomisation. As regards water hydraulics, several
groups can be powered by one HighPur. This is limited by the HighPur’s capacity.
The separate groups must be able to send requests to the HighPur independently of one
another and the HighPur must be able to inform the group in question that it has reached
operating pressure. To this end, a parallel connection is made between the “HighPur request” and “Operating pressure reached” or “Bus IN” and “Bus OUT” clamps from one device to the next. When making this connection, ensure the colours and/or cable numbers
are strictly kept in the proper order as it may otherwise lead to malfunctions.
Created: 07.02.2008
Changed: 11.08.2011
Printed: 11.08.2011