Download OpenPowerNet User Manual

Transcript
OPN/51/1.2.2
Page 143 of 168
User Manual
Issue 2010-05-12
</Connector>
</ConnectorSlice>
The rail connector configuration for track 2.
<ConnectorSlice name="rail connector, track 2" firstPos_km="20" lastPos_km="30.4"
maxDistance_km="0.25">
<Connector zReal_Ohm="0.00001" zImag_Ohm="0">
<ConductorFrom condName="RL" trackID="2" />
<ConductorTo condName="RR" trackID="2" />
</Connector>
</ConnectorSlice>
</ConnectorSlices>
<Leakages>
The leakage configuration for track 1.
<Leakage firstPos_km="20" lastPos_km="30.4" yReal_S_km="0.1" yImag_S_km="0">
<ConductorFrom condName="RL" trackID="1" />
<ConductorTo condName="E" trackID="1" />
</Leakage>
<Leakage firstPos_km="20" lastPos_km="30.4" yReal_S_km="0.1" yImag_S_km="0">
<ConductorFrom condName="RR" trackID="1" />
<ConductorTo condName="E" trackID="1" />
</Leakage>
The leakage configuration for track 2.
<Leakage firstPos_km="20" lastPos_km="30.4" yReal_S_km="0.1" yImag_S_km="0">
<ConductorFrom condName="RL" trackID="2" />
<ConductorTo condName="E" trackID="1" />
</Leakage>
<Leakage firstPos_km="20" lastPos_km="30.4" yReal_S_km="0.1" yImag_S_km="0">
<ConductorFrom condName="RR" trackID="2" />
<ConductorTo condName="E" trackID="1" />
</Leakage>
</Leakages>
</Line>
After the configuration of the conductors for both lines and all tracks the electrical connection
between the lines and tracks shall be configured.
The electrical connection of track 1 and 3 at km 9+650.
<Connectors>
<Connector name="MW track 1-3, km 9+650" zReal_Ohm="0.000010" zImag_Ohm="0">
<ConductorFrom condName="MW" lineID="A" trackID="1" km="9.650" />
<ConductorTo condName="MW" lineID="A" trackID="3" km="9.650" />
</Connector>
<Connector name="CW track 1-3, km 9+650" zReal_Ohm="0.000010" zImag_Ohm="0">
<ConductorFrom condName="CW" lineID="A" trackID="1" km="9.650" />
<ConductorTo condName="CW" lineID="A" trackID="3" km="9.650" />
</Connector>
<Connector name="RL track 1-3, km 9+650" zReal_Ohm="0.000010" zImag_Ohm="0">
<ConductorFrom condName="RL" lineID="A" trackID="1" km="9.650" />
<ConductorTo condName="RL" lineID="A" trackID="3" km="9.650" />
</Connector>
<Connector name="RR track 1-3, km 9+650" zReal_Ohm="0.000010" zImag_Ohm="0">
<ConductorFrom condName="RR" lineID="A" trackID="1" km="9.650" />
<ConductorTo condName="RR" lineID="A" trackID="3" km="9.650" />
</Connector>
The electrical connection of track 1 and 2 at km 9+750.
<Connector name="MW track 1-2, km 9+750" zReal_Ohm="0.000010" zImag_Ohm="0">
<ConductorFrom condName="MW" lineID="A" trackID="1" km="9.750" />
<ConductorTo condName="MW" lineID="A" trackID="2" km="9.750" />
</Connector>
<Connector name="CW track 1-2, km 9+750" zReal_Ohm="0.000010" zImag_Ohm="0">
<ConductorFrom condName="CW" lineID="A" trackID="1" km="9.750" />
<ConductorTo condName="CW" lineID="A" trackID="2" km="9.750" />
</Connector>
<Connector name="RL track 1-2, km 9+750" zReal_Ohm="0.000010" zImag_Ohm="0">
<ConductorFrom condName="RL" lineID="A" trackID="1" km="9.750" />
<ConductorTo condName="RL" lineID="A" trackID="2" km="9.750" />
</Connector>
<Connector name="RR track 1-2, km 9+750" zReal_Ohm="0.000010" zImag_Ohm="0">
<ConductorFrom condName="RR" lineID="A" trackID="1" km="9.750" />
<ConductorTo condName="RR" lineID="A" trackID="2" km="9.750" />
</Connector>
IFB DD, UM_OPN_51_01.02.02.doc
Page 143 of 168
DMJ, 2010-05-12