6 Installation
Country
Switch setting
Default
language
SE
en
PL
en
BA/BG/EE/HR/
LV/LT/ME/RO/
RS/SK/TR
en
ATTENTION
The communication board may be damaged by
electrostatic discharge.
• Touch a grounded point, for example the holder for
the housing screw connection on the bottom right,
before touching the circuit board.
Table 5: DIP switch settings (cont.)
Overview of the communications interfaces
1 with frequency-dependent active power reduction
2 with frequency dependent active power reduction and
reactive power control according to VDE-AR-N 4105
3 Feed-in current per phase, in relation to the entire system.
Only valid for inverters with AC apparent power up to 5500 VA.
6.5.2
Communication board II
In terms of communication options, four different situations are taken into account.
1. Inverter configuration.
2. Direct retrieval of the current yield value and/or
saved log data.
3. Transferring the yield data to an Internet solar portal.
After commissioning, a prompt to select the country
setting appears in the display (4).
4. Remote retrieval of the current yield value and/or
saved log data.
Situation 1: Configuring the inverter
1
2
4
3
All communication settings, for example, activation of
data transfer to a solar portal, are made via the integrated web server. To access the configuration on the
web server, you will need a computer, which must be
connected to the inverter.
The inverter is equipped with an Ethernet interface
(RJ45 socket) for this purpose. The computer must
also be equipped with this type of interface. The operating system is irrelevant. An Internet browser must be
installed on the computer.
Fig. 23: Display on the inverter
You can then connect the inverter and computer either
• Press the arrow keys (1 or 2) to select the desired
country.
a) via a local network (switch and Ethernet cable,
see figure 24), or
• Press the Enter key (3) to go to the confirmation
window.
b) directly via a so-called crossover cable (see figure 25).
• Press the arrow keys (1 or 2) to switch between
“NO” and “YES” choices.
• Press the Enter key (3) to confirm your selection.
Version a) is the best option when a local network is
already available. Several inverters can also be connected in the network (figure 26).
Version b) is the best option when no switch is available.
6.6 Connecting communication components with communication board I
Install the available communication components now,
such as a modem, cables, etc.
DANGER
Risk of death due to electrical shock!
Single-insulated cables from communication components may come into contact with parts carrying mains
voltage if the insulation is damaged.
• Only connect double-insulated cables to the
inverter.
Installation and Operating Manual for convert Solar Inverter