Download Duramax Building Products 00911 Use and Care Manual
Transcript
Storage Shed OWNER’S MANUAL / Instructions for Assembly Patent #416.091 Size 5’ x 3’ Ver: 1.0 Customer Service Hotline (800) 483-4674 www.uspolymersinc.com Requires two people and takes under 1 hour for Installation. • All Weather Durable PVC • Available in Various Sizes • Fire Retardant • Rust or Rot Proof • Maintenance Free • Wide Double Doors • Quick & Easy Assembly • High Head Room for Garden Implements • Never Needs Painting • Good Insulator Call us for any missing or damaged parts. Do not return to the store. Duramax Storage Shed Limited Fifteen Year Warranty U.S. Polymer Inc. will send a replacement part free of charge, in the event of material defects and or workmanship for a period of fifteen years from the date of purchase. This warranty is extended only to the original purchaser. A purchase receipt or other proof of date of original purchase will be required before warranty service is rendered. In no event shall we pay the cost of flooring, labor, installation or any other costs related thereto. This warranty only covers failures due to defects in material or workmanship which occurs during normal use and does not extend to color change arising due to normal weathering or to damage resulting from misuse or neglect, commercial use, failure to follow assembly instructions and the owner’s manual (including proper anchoring of the shed), painting, forces of nature and other causes which is beyond our control. Claims under this warranty must be made within the warranty period by calling 1-800-483-4674 or mail in a dated sales slip and clear photograph of the part to: U.S. Polymers, Inc. 6915 Slauson Avenue Commerce, CA 90040 We reserve the right to discontinue or change components. If a component has been discontinued or is not available, U.S. Polymers, Inc. reserves the right to substitute a component of equal quality as may be compatible. Limits and Exclusions There are no express warranties except as listed above. The warrantor shall not be liable for incidental or consequential damages resulting from the use of this product, or arising out of any breach of this warranty. All express warranties are limited to the warranty period set forth above . Some states do not allow the exclusion or limitation on how long an implied warranty lasts, so the above limitations may not apply to you. This warranty gives you specific legal rights and you may also have other rights which vary from state to state or country to country. Parts List Note: Check all parts prior to installation. CODE DESCRIPTION BPF FCRE FCLE CME CCE CB2E CB2B RS1E RS2E RS3E RS5E RS14E DSHE SPE FPE RP RRE DL DR BASE PALLET FRONT COLUMN RIGHT FRONT COLUMN LEFT MIDDLE COLUMN CORNER COLUMN SIDE CENTER BAND BACK CENTER BAND RS1 ROOF STRUCTURE RS2 ROOF STRUCTURE RS3 ROOF STRUCTURE RS5 ROOF SRTUCTURE SAGGING SUPPORT DOOR STOPPER HORIZONTAL SIDE PANEL FACIA PANEL ROOF PANEL RIDGE COVER LEFT DOOR RIGHT DOOR ACCESSORIES QTY CODE DESCRIPTION 1 1 1 1 2 2 1 2 4 2 2 2 1 4 2 2 1 1 1 FDCL FDCR FCC FMC FCB RJ PPG PWS PIN S1 DOOR COLUMN FITTING LEFT DOOR COLUMN FITTING RIGHT CORNER COLUMN FITTING MIDDLE COLUMN FITTING CENTER BAND FITTING 90 DEGREE JOINT ROOF PLUG ROOF PLUG WASHER ROOF PIN DIA. 4.2 x 16mm. (5/32” x 5/8”) SHEET METAL SCREW DIA. 4.2 x 32mm. (5/32” x 1 1/4”) SHEET METAL SCREW DIA. 4.2 x 45mm. (5/32” x 1 3/4”) SHEET METAL SCREW METAL WASHER S2 S5 S6 QTY 1 1 4 1 4 4 34 34 34 45 FRONT COLUMN LEFT (FCLE) FRONT COLUMN RIGHT (FCRE) CORNER COLUMNS (CCE) MIDDLE COLUMNS (CME) ROOF STRUCTURES (RS 1E, 3E ) (CB - 2B, 2E ) DOOR STOPPER (DSHE) 8 14 14 ROOF STRUCTURE (RS5E) ROOF SUPPORT (RS2E) SAGGING SUPPORT (RS14E) MIDDLE COLUMN FITTING (FMC) CENTER BAND FITTING (FCB) DOOR COLUMN FITTING (FDCR) DOOR COLUMN FITTING (FDCL) PVC 90 DEGREE JOINT (RJ) CORNER COLUMN FITTING (FCC) ROOF PLUG WASHER (PWS) Tools You Will Need Cordless Drill - Philips Head Hammer or Rubber mallet Carpenters Square 8’ Step Ladder Adjustable pliers Level - 3ft. Tape Measure Caulk Gun Waterproof Clear Silicon Sealant Hand Gloves BASE PALLET (BPF) ROOF PIN (PIN) ROOF PLUG (PPG) Exploded View RRE RP RP RS14E RS14E FPE RS3E RS2E RS2E RS2E RS5E RS1E DSHE RS2E SPE SPE RS3E RS1E FPE CME SPE CCE CB2B CB2E CCE SPE FCRE CB2E BPF FCLE DR DL A. Base, Walls & Columns Note: It is important that these instructions are followed step by step. Note All panels are clearly marked and care should be taken to use the correct one. Parts Needed: (1) Base Pallet (BPF) (2) Corner Column (CCE) (1) Front Column Right (FCRE) (1) Front Column Left (FCLE) (1) Middle Column (CME) (4) Side Panels (SPE ) (2) Side Center Band (CB2E) (1) Back Center Band (CB2B) (4) Center Band Fitting (FCB) 1. Place the base pallet (BPF) on the ground with the flat surface facing down. BPF 2. Slide front column right (FCRE) into groove of the the Base pallet (BPF) on the right side of the pallet. Line up the pre-drilled holes on (FCRE) Column with pre-drilled holes on Base pallet. Secure with four (S5) Screws with (S6) washers from outside. (See blowup detail fig.1) FCRE FCRE BPF S6 fig.1 1 S5 BPF 3. Insert the side panel (SPE ) into the groove of front column (FCRE). Start at the bottom of the panel at an angle then push into place. Note Always place panels into frame at an angle on top and slide in sideways and downward for easy insertion. SPE FCRE Note Make sure panels are right side up with panel shingles facing down. Check the stamped label on top. of all panels. SPE BPF Inside 4. Slide corner column (CCE) into side panel (SPE the column to the side panel. Note ) pushing Make sure the side panel seat inside the base pallet groove. SPE CCE CCE SPE SPE BPF CCE BPF 5. Working outside use (S5) screws with (S6) washers to secure column to base pallet (BPF). 0utside 2 S6 S5 6. To stabilize the side panel attach the side center band (CB2E). Start with the center band fitting (FCB) . Fix to corner column (CCE) & (FCRE) with (S2) screws.To continue See figures (fig.1) and (fig.2). SPE Tip To insure easy assembly Locate the identification number of each part. 1&2 1&2 CB2E CB2E CCE FCRE BPF CCE FCB Fig.1:Use (S2) screw. Fix (FCB) to (CCE) & (FCRE). Leave it loose. 3 CCE CB2E FCB Fig.2: Use (S1) screw. Fix (CB2E) to (FCB). 7. Insert the side panel (SPE ) into the groove of corner column (CCE). Start at the bottom of the panel at an angle then push into place. SPE CCE BPF 8. Slide the middle column (CME) into the base pallet groove. Use (S5) screws with (S6) washer to secure column to the base pallet (BPF). See blowup. SPE CME CME BPF SPE BPF S6 S5 9. Insert the side panel (SPE ) into the groove of middle column (CME). Start at the bottom of the panel at an angle then push into place. CME 4 SPE 10. Slide the corner column (CCE) to the side panel (SPE ) pushing the column to the side panel. See fig. (1 & 2). 1 SPE CCE 2 fig.1 fig.2 CCE 11. Working from outside use (S5) screws with (S6) washers BPF to secure column to base pallet (BPF). S6 0utside S5 2 3 12. Stabilize the side panel with the center band (CB2B). Fix (FCB) fitting to the corner column (CCE). Follow the fig. 1, 2, 3 & 4. 1&4 CB2B CB2E CCE CME CCE CB2B CCE CCE CME CCE CB2B CB2B CB2E FCB Fig.1:Use (S2) screw. Fix (FCB) to (CCE). Leave it loose. 5 CB2B FCB FCB Fig.2: Use (S1) screws. Fig.3: Use (S1) Fix (CB2B) to (FCB) and (CB2E) screws.Fix (CB2B) to (CME) column. Fig.4: Use (S1) screws. Fix (CB2B) to (FCB). 13. Insert the side panel (SPE ) into the groove of column (CCE) start at the bottom with panel at an angle then push into place. CCE SPE 14. Slide the front column (FCLE) into the groove of the base pallet (BPF) on the left side of the door. Line up the pre-drilled holes on (FCLE) column with pre-drilled holes on base pallet. Fix with (S5) screws with (S6) washers from outside. See blowup detail. FCLE BPF FCLE S6 S5 6 15. To stabilize the side panel attach the center band (CB2E) from inside. Start with the center band fitting (FCB) fix to the column (FCLE) with (S2) screws. See fig. 1, 2 & 3. FCLE CB2E CCE CB2E FCB CB2B FCLE 1&3 FCB 2 CB2E Fig2: Use (S1) screws. Fix (CB2E) to (FCB) and (CB2B). Fig.1: Use (S2) screw. Fix (FCB) to (FCLE). Leave it loose. CB2B CCA FCLE CB2E Inside FCB Fig.3: Use (S1) screw. Fix (CB2E) to (FCB). Note After completing the center band assembly fully tighten the four center band fittings (FCB) to the columns. FCRE FCLE ing Open Door m 1357m ” 53 1/2 B. Roof Frame Parts Needed: (2) RS1 Roof Structure (4) RS2 Roof Structure (2) RS3 Roof Structure (2) RS5 Roof Structure (1) Door Stopper Horizantal 7 (RS1E) (RS2E) (RS3E) (RS5E) (DSHE) (1) Door Column Fitting Left (1) Door Column Fitting Right (4) Corner Column Fitting (1) Middle Column Fitting (4) 90 Degree Joint (FDCL) (FDCR) (FCC) (FMC) (RJ) 1. Insert the middle column fitting (FMC) into top FMC of middle columns (CME) square tubing inserts. Fix the column fittings (FMC) to columns (CME) with (S1) screws from inside the shed. CME FMC FMC CME Inside of the shed S1 Inside of the shed FCC 2. Insert the corner column fittings (FCC) into the FCC FCC corner column’s (CCE) and the corner of (FCLE) & (FCRE) square tubing insert. Fix with (S1) screws from outside of the shed. FCC CCE CCE FCRE FCC FCLE FCC CCE CCE S1 Outside of the shed Outside of the shed FCC FCC FCRE FCRE 3. Insert the front column fittings (FDCL) and (FDCR) FDCR left and right into the front columns (FCLE) and (FCRE) square tubing inserts. Fix with (S1) screw. FDCL FDCR FCRE 8 Inside of the shed FCLE 9 RS3E RS1E RS2E RS1E RS2E RS5E RS5E RS2E DSHE RS2E ROOF STRUCTURE EXPLODED VIEW RS3E Roof structure assembly 4. Lift the (RS1E) roof structure into position on top of front columns. Line up pre-drilled holes with door column fittings (FDCL) & (FDCR). Use (S1) screws to fix (RS1E) roof structure to the front columns with left and right doorcolumn fittings. See fig. Note Make sure (RS1E) roof structure’s U-Channel is positioned down. f ide es s l o r h ete am . i d all e d Sm t h e s h of ng aci de insi RS1E RS1E ide es s hol r te me dia ed. Big the sh of in fac Front Inside of the Shed FCRE go uts ide FCLE RS1E RS1E FDCR FCRE RS1E RS1E FDCL FDCR FDCL FCRE FCLE FCLE Front Inside Front Inside Front Inside Front Inside Step 1 Step 2 Step 1 Step 2 5. Fix the door stopper horizontal (DSHE) to the front roof structure from inside with 6 (S1) screws. Position the latch hole to face down. DSHE U-channel opening inside the shed. Latch Hole DSHE DSHE Inside Shed 10 6. Lift the (RS1E) roof structure into position on top of back middle columns (CME). Line up pre-drilled holes with column fittings (FMC). Use (S1) screws to fix (RS1E) roof structure to (FMC). fac side s e l o r h ete am . i d all e d Sm t h e s h of RS1E ing insi de r h ete m a di ed. Big the sh of RS1E RS1E Note s si ole fa de c o ing uts ide RS1E Make sure (RS1E) roof structure’s U-Channel is positioned down. FMC FMC CME CME Back Inside Step 1 Back Inside Step 2 Inside Back of the Shed RS1E CME 11 7. Insert 90 degree joint (RJ) into the (RS3E) U-channel Roof support. Use a hammer to push in.Repeat on both ends of (RS3E). Fix (RJ) to (RS3E) with (S1) screws (2 sets). RJ Note RS3E RS3E RS3E RJ After assembly make sure (RS3E) roof structure’s U-Channel is positioned down. RS3E 8. Insert the roof supports (RS3E) into the roof structures (RS1E). See (fig.1 & 2) RS3E RS3E RJRJ RS1E RS1E CCE fig.1 S2 RS3E S1 RJ FCC CCE fig.2 12 Secure (RJ) 90 degree joint to (RS1E) with (S1) screws on top of the four corner columns. Secure (RJ) with (FCC) using (S2) screw on all the four corner columns. 9.Lift the roof structure (RS5E) into position on roof structure (RS1E). Use (S1) screws to fix (RS5E) to (RS1E). See (fig.1) and (fig. 2). 2 RS5E 1 RS5E RS5E RS5E RS5E Make sure the angle side is up. RS5E RS5E RS5E RS5E RS1E RS1E Back outside Front outside RS1E fig.1 fig.2 10. Attach (RS2E) to roof structures (RS5E) and (RS3E) using (S1) screws. See (fig.1,.2 & 3). 3 RS2E RS2E 2 RS2E RS2E 1 3 3 RS2E 3 This cing face fa This fa inside ce facin of the g outs shed. e she ide of th d. RS2E RS5E RS5E RS2E RS2E RS2E S1 RST RS3E RS5E RS5E RJ RS2E RS2E RS1E RS1E Front outside fig.1 13 Back outside FCC CCE fig.2 fig.3 Fix (RS2E) to 90 degree joint (RJ) through (RS3E) with (S1) screw. C. Roof panels Parts Needed: (2) Roof Panels (RP ) (2) Facia Panel (FPE) (1) Ridge Cover (RRE) (34) Roof Plug Washer (PWS) (34) Roof Plugs (PPG) (34) Roof Pins (PIN) (2) Sagging Support (RS14E) FPE Front Fig.1 1. Place facia panel (FPE) to front roof structure. FPE Front 2. First put the roof plug washer on the roof plug. Fig.2 Locate the holes in the facia panel through roof structure and fix with roof plugs w/washers. Use a hammer to drive in plastic pins (rubber mallet).See figures 1, 2 & 3 for details. Repeat action to fix facia panels on backside. See figures 4, 5 & 6 FPE Front Fig.3 FPE Back Fig.4 fig. A fig. B FPE Back Fig.5 FPE Back Fig.6 14 TIP First insert all roof plugs with washers to the panels (left & right) then drive in the roof pins. 3. Attach the roof panels by sliding the roof panel (RP ) on roof structure. Locate the hole positions of the roof panel and roof structure. Fix with plastic washers and plugs. Use a hammer to drive in plastic pins. See figures 1 & 2. Note Insert roof plugs into roof panels only as indicated. Note KEY Roof Plug Leave holes unplugged at this point. RP RP FPE FPE Fig.1 4. Attach the ridge cover (RRE) on top of the roof panels (RP Fig.2 ). See fig. RRE 15 Note Finish the roof panels with a little silicone glue around the roof plugs holes. 5. Insert the sagging support (RS14E) from inside the shed by sliding it between roof support (RS5E) and roof panel until it reaches (RS3E) roof support for each panel. See figures. RS14E RS14E RS5E RS3E Outside View Inside View D. Doors Parts Needed: (1) Door Left (1) Door Right 1. Attach the doors left and right (see fig.1) with Loose pin hinges on front columns (FCLE) and (FCRE). fig.1 16