Download Powerware Tool Storage 9155 User's Manual
Transcript
INSTALLING OPTIONS 11. Reinstall the front covers, starting with the bottom cabinet (see Figure 21). Hang the top edge of the cover on the cabinet first, then lower the bottom edge and snap into place. Be sure the cables fit in the access holes in the covers. Figure 21. Reinstalling the Front Covers 12. Continue to “Stabilizing the Cabinet” on page 31 to complete the parallel UPS installation. EATON Powerware® 9155 Parallel UPS (8–15 kVA) User’s Guide S 164201592 Rev C www.powerware.com 29