Download APC Replacement Battery Cartridge #117
Transcript
Smart-UPS® X-Series 2000-3000 VA RBC 117 & 118 UPS Replacement Battery—APCRBC117 For information on recycling the used battery, see the Used Battery Information sheet included with the replacement battery. su0477a su0474a su0619a su0473a Remove the UPS Battery su0595a su0594a su0620 a Install the UPS Replacement Battery XLBP Replacement Batteries—APCRBC118 Remove the XLBP Batteries su0584a su0573a su0574a Install the XLBP Replacement Batteries su0596a su0597a Reset the Battery Install Date Reset the Battery Install Date for the internal UPS battery. su0343b If the Battery Install Date screen does not appear on the display interface within two minutes of installing the new battery, use the arrow keys to navigate to: Main Menu > Configuration > Battery Install Date. On the Battery Install Date screen, use the arrow keys to select the month, date, and year. Press ENTER to make a selection and move to the next option. When finished, press ENTER to save the date. When the RBC is fully charged, perform a self-test and run time calibration test. Customer support and warranty information is available at the APC Web site, www.apc.com. © 2010 APC by Schneider Electric. All trademarks are owned by Schneider Electric Industries S.A.S., American Power Conversion Corporation, or their affiliated companies. 990-3708 01/2010