Download Untitled - Strebel
Transcript
Condensation drain pipe STREBEL boilers produce condensate. This condensate must be drained otherwise the boiler will not function. The collecting condensation drain pipe should be connected to the drain by means of an open connection. By this means the possibility of drain gases ending up in the boiler is prevented. The drain connection should have a minimum diameter of 32mm. Connect the condensation drain pipe according to the actual regulations. The following components are connected to the collective condensation drain pipe: - Condensation discharge; - Safety valve; Draining of the condensation water to the external rain guttering is not permitted in view of the danger of freezing. Before putting the boiler into operation fill the siphon with 300 ml of water. Installation Instructions Strebel Q-boiler range 6.6 15