Download Suggested manual format
Transcript
Slide the gas connection through the cut out of the sheet metal part and mount the casing again. Connect the gas tank to the unit. WARNING: Secure the gas tank with the chain to ensure the tank can not fall down. Connect the keg connection as shown with a cleaning tank and clean the complete system as described in “Sanitizing Product Coils”. Afterwards connect product tank to the keg connection. Turn on the CO2 bottle and set the pressure gauge to the required equilibrium pressure +5 psi Turn the switch at the beer monitor to release the gathered foam into the overflow. Activate the pint portion. Check correct operation and ensure the product pipes are fully primed. Check portions are correct using a marked container. Commissioning UltraFlow font (see Operation)