Download to view the addendum in Adobe format
Transcript
DO NOT POWER-UP YET IMPORTANT START-UP INSTRUCTIONS FOR DAIKIN INVERTER ComfortNet™ CONDENSING UNITS & HEAT PUMPS ONLY! C23 R57 F5 F17 D25 U11 R60 R80 R61 R58 R72 C27 R62 C24 wire nut R63 D26 F18 F19 F20 R64 R68 + R69 C26 R To Line Voltage. Provide Over-Current Protection. R70 C28 F1 C29 C D8 C31 NO C HEAT PUMP OR CONDENSING UNIT C 2 1 R Communicating AIR HANDLER OR FURNACE White Yellow Green C 1 R ZONE 2 OPEN R12 K8 LED15 D12 IAQ RELAY W2 / EMERGENCY FAN R41 R40 R79 1 3 C9 D20 C42 + C32 F8 L2 2 C Remove & connect the CTK04 thermostat directly to the HVAC system as shown below. R24 OAS R25 R26 SAS Perform the Initial System Test, Verify Refrigerant Charge or Pump the system down for repairs! When you’re done, re-connect the CTK04 back to the Zone 1 T-stat terminal block! R109 R113 R115 U14 R110 R114 U15 R111 R116 U16 R46 ON 2 + R118 C41 R45 R119 C43 R38 D18 R37 D17 1 CTK04 Communicating Thermostat R112 R43 HEAT / B COMPRESSOR F7 FB2 CONTROL SYSTEM ZONE 1 OPEN LED17 C8 F6 + U17 D19 W Y G R ® LED16 R13 K9 D28 C 2 1 R LED11 LED14 JMP1 U4 ZONE 3 OPEN LED13 RC/RH LINK 2 U3 LED10 R11 K7 LED12 D11 G RH S RC Y S C T E M C14 R ONE ZONE R23 K6 R10 R8 R7 R6 D10 1 R83 D13 D14 C15 D15 D16 C16 D9 NC Red ZONE Y1 R9 IAQ RELAY SYSTEM W2/E W1/B O Y Daikin Inverter R76 C21 K5 Dedicated Field Supplied Listed 24 vac transformer 40 va - 60va R74 D27 Green C W/E O/B Y R G IAQ R R66 C25 C2 White Yellow C 2 1 R U12 BIASING C30 TERMINATION SYSTEM CLIMATE TALK RECEIVE DATA R39 LED22 24v “R” wire is not required on Daikin Inverter units only! Connect 24v “Commons” together, to insure proper data line communication. Temporary wire cable R 1 2 C CTK04 Communicating Thermostat EWC Controls Inc. 385 Highway 33 Englishtown, NJ 07726 800-446-3110 FAX 732-446-5362 E-Mail- [email protected] Copyright © 07/15/2014 1. Connect the CTK04 thermostat directly to the HVAC system, as shown. 2. Power up the HVAC system. DO NOT power the UT3000. 3. Allow the CTK04 to find the HVAC system. 4. Perform the Initial SYSTEM TEST via the CTK04. (Refer to Daikin Installation) 5. Perform the Refrigerant CHARGE MODE via the CTK04. (Refer to Daikin Installation) 6. Perform a SYSTEM PUMP-DOWN to repair/replace components on the sealed system. 7. If desired, modify any other Advanced Menu items (Trim Settings, Cooling Profile, Heat Setup, etc). ** After these tasks are completed: 8. Disconnect the CTK04 from the HVAC System. 9. Connect the CTK04 to the Zone 1 Block. 10. Power up the UT3000 Zone Controller. 11. Allow the UT3000 to find the HVAC system. 12. Finish the Installation & Operate the Inverter in zoned mode. 13. Call EWC Technical Support if you have any trouble.