Download Sartorius FBG Operating instructions
Transcript
Getting Started Fastening the Display and Control Unit to the Front of the Weighing Platform or Mounting it Separately ● Turn the scale over and place it on a cushioned surface to prevent damage to the weighing system ● Fasten the retainer to the display and control unit using the two Phillips head screws 1 (M4x12) ● Fastening the display and control unit to the weighing platform: Fasten the retainer with the two Phillips head screws 2 (M4x12) to the weighing platform ● Press the cable into the raceway (channel) as shown in the diagram on the left > Cable length: 55 cm (approx. 21.7 inches) k To order a longer cable, see the section entitled “Accessories” FBG34EDE-H, FBG34EDE-P, FBG16EDE-H, FBG12EDE-P, FBG64EDE-S, FBG64EDE-H ● Use the two Phillips head screws (M 4 x 8) supplied to fasten the display and control unit to the column ● Attach the column to the scale using the screw (M 4 x 20) supplied ● Fasten the connecting cable to the column using the three clips 7