Download Argus Switched Mode Battery Charger Technical data

Transcript
12 Operation on an ISDN Access
12.12.1 Starting Several Tests to Run Simultaneously
Starting a new test or connection during an existing connection

Example:
There is a connection on B-channel 1.

<TM> Calls the Test Manager 
or
Single tests
<
>

The ARGUS displays the number of existing connections
(-/01). 
Select "Start new one". 

The ARGUS will open the Main menu. 

Select single tests.



Select the desired test, e.g. BERT


Start BERT (still connected)

For information on running a BERT, see page 119



The ARGUS will open the Test Manager.

Select “Outgo. connect.”.
An example of the
display
The connection
was the first
started
Tests
1/02
There are currently
two active
connections or tests
B01
The connection 
uses B-channel 1

The ARGUS will open the "Connect. Tel." display.
If a test (or connection) is cancelled or cleared, the
ARGUS will return to the Test Manager if there is another
test (or connection) running in the background.
ARGUS 42 PLUS
155