Download Christ ALPHA 1-2 LDplus Technical data
Transcript
4.8. Initial start-up ATTENTION! Prior to start-up, make sure that the freeze dryer has been properly set up and installed (see section 4.1 “Site of installation” and the following points). 4.8.1. Functional components and control elements Aeration valve Drying chamber Ø300 Ice condenser chamber Ice condenser Control system LSC Mains switch Additional interface connection (option, sep. accessory) Serial interface Vacuum pump power supply connection Power supply connection of pressure control valve and stop valve Mains fuse Mains cable Name plate Vacuum connection Heat exchanger of refrigeration unit 28 • Installation and Commissioning of the Unit Equipotential bonding screw for protective ground wire check and central ground connection Operating Manual Freeze Dryer ALPHA 1-4 LSC / ALPHA 2-4 LSC