Download Vilter 330 Specifications

Transcript
3-
DIMENSIONS, CLEARANCES, WEIGHT DISTRIBUTION (CONT.)
3.4 - 30GX 207-358
Clearances required
for operation and maintenance
2
Clearances required for evaporator tube
removal. Clearances can be either on the left
or on the right hand side.
2287
1
Water inlet
Water outlet
30GX-207
30GX-227
30GX-247
30GX-267
30GX-298
30GX-328
30GX-358
Power supply
Air outlet - do not obstruct
A
1000
1830
1000
kg: total operating weight
1
A mm B mm
1
2256
1
kg
30GX207
30GX227
5540
5996 2895
5570
30GX247
30GX267
6911 2470
30GX298
7826 2220 7354
30GX328
30GX358
8741 1250
6134
6365
7918
8124
2
1830
2
1
B
Multiple chiller installation (see note 2)
SOLID SURFACE AREA
Notes:
1. Unit must have clearances for air flow as follows:
Top: do not restrict in any way
2. In case of multiple chillers (up to four units), the
respective clearance between them should be increased
from 1830 to 2000 mm for the side space requirement.
3. Clearances sre required for cooler tube removal.
2000
2000
2000
1830
1830
SOLID SURFACE AREA
2000
1525
1525
NOTE: Refer to the certified dimensional drawings supplied with the unit, when designing an installation.
8