Download DOD SR400D Specifications
Transcript
b. Depress the calibration button. c. Put tube into graduated cylinder at the same time. d. Hold for one minute. e. Check the flow rate and adjust the pump as needed. (Flow rate is found on the pesticide label.) f. Recheck for one minute. 16. Turn on all switches. a. First turn on circuit breaker located on the outside of the electrical control box. (Located next to the hour meter.) b. Blower Circuit breakers for the blower, spray head, and pump are located inside of the electrical control box. 17. Depress the power switch, located on remote control panel. a. The switch indicator light will illuminate and the fan and spray head will start. The spray head will run at idle speed (about 15,000 rpm). b. The spray head will accelerate to its spraying speed and the blower will start. 125