Download Signature SG150-P Installation guide
Transcript
7.2.3 Restore to normal operation after “total off” View of the panel after pressing the button “total off”. • All Contacts are open. • Rectifier, Inverter and Static-Switch shutdown. 1. Reset “total off” by pressing and holding the “total off” button and the “inverter on” ( I ) key simultaneously until the Rectifier starts. 2. Connect the Battery to the UPS by closing the Battery Switch or Fuses, in case of External Battery. 3. Press “inverter on” ( I ) key. • Soft-start of Inverter indicated with blinking LED. • At the end of Soft-start the LED remains lit. • UPS output LED indicates Load on Inverter. The LCD must display on the main screen the status “LOAD ON INVERTER”. END OF PROCEDURE Modifications reserved OPM_SGS_USM_M10_M15_0US_V030.doc Page 50/82 Operating Manual SG Series 100 – 120 - 150 kVA