Download APC MGE Galaxy 300i Specifications

Transcript
8. Re-install the UPS covers. See “Prepare UPS for Cables“ for more information.
9. Connect the combined battery breaker and ATIZ signal cable to the UPS as shown and make sure
to connect the cable with shielded layer to the screw on the UPS.
34
MGE™ Galaxy™ 300 380/400/415 V Installation
990–3618E-001