Download Baxi TS Super Technical data
Transcript
8.0 Checking for Spillage 8.4 Captive Nut Completion 1. Take the black painted extension piece, captive nut and screw from the fire contents kit. Door Shield 2. Fit the captive nut to the rear edge of the door shield, over the hole (Fig. 34). 3. Slide the extension piece between the door shield and the casting, ensuring the location hole locates over the pip on the door shield (Fig. 36). Fig. 34 4. Secure the extension piece to the door shield using the black screw (Fig. 37). 5. Replace the controls access door (Fig. 35). 6. These instructions and the users instructions should be handed to the customer. At the same time the customer should be shown how to operate the fire and boiler safely and efficiently. Controls Access Door Fig. 35 7. The need for annual servicing should be emphasised and the returning of the guarantee card advised. Extension Piece Location Hole Fig. 36 Location Pip Fig. 37 17