Download Milnor 30015T5E Installation manual
Transcript
Chapter 4. Testing and Troubleshooting Flush Chemical Manifold (Output 12)—When this output is on, control voltage flows between fuse EF71B and pin 1 of MTA7. This signal tells the chemical supply system that the chemical injection is complete and the machine desires to flush the chemical injection manifold. Inject Detergent (Output 13)—When this output is on, control voltage flows between fuse EF71B and pin 7 of MTA6. This signal tells the chemical supply system that the machine desires detergent. Inject Bleach (Output 14)—When this output is on, control voltage flows between fuse EF71B and pin 3 of MTA6. This signal tells the chemical supply system that the machine desires bleach. Inject Sour/softener (Output 15)—When this output is on, control voltage flows between fuse EF71B and pin 1 of MTA6. This signal tells the chemical supply system that the machine desires sour/softener or sour/starch. — End of BICEUT02 — Document .............. BICEUF02 Spec Date ................ 20010122 As-of Date ............... 20010122 4.3. TxE Event Timing The following tables list the events in each formula. This information is especially useful when testing the machine with the display kit connected, as explained in “Testing TxE Washerextractors” (see the table of contents). 4.3.1. 4.3.1.1. Hotel and Hospitality Software Formula Set 1 Table9: Events for Hotel and Hospitality Set 1, Formula A Current Event 0 1 2 3 4 5 6 7 8 9 Event Type Suds Drain Rinse Drain Rinse Drain Sour/softener Drain Extract Coast PELLERIN MILNOR CORPORATION Attributes Split water to low level Split water to high level Cold water to high level Cold water to low level Start Time (QQQ) End Time (QQQ) 0 32 37 45 50 58 63 79 84 112 32 37 45 50 58 63 79 84 112 117