Download Manual - Ideal
Transcript
INSTALLATION 19 CONNECTING THE FLUE TO THE BOILER 1. Insert the flue assembly through the prepared hole in the wall. 2. Fit the flue turret on the top of the boiler ensuring that the seal is in place, and that the flue outlet seal at A is correctly located. 3. Locate the flue into the turret. 5. Flues over 0.72 metre long. Fix the flue support bracket to the wall, using the wall plug and wood screw. For standard installations use the short wood screw. If the stand-off option is used, secure the support bracket using the spacer bracket and long wood screw. 4. Secure the flue turret on top of the boiler by inserting the 4 screws provided. Flue restrictor $ Note. When no extension duct is used, the flue restrictor supplied in hardware pack A, must be fitted. 20 FLUE EXTENSION DUCTS - For flue lengths greater than 720 mm FLUE OUTLET Pack D Flue extension duct kit contents. Extension duct and clamp 965 mm (38) Flue duct support with wall plugs. 21 FLUE EXTENSION DUCTS - continued )OXHOHQJWK The maximum total flue length is 3 m ([WHQVLRQIOXH General arrangement 1. A maximum of 3 extension ducts (one suitably cut) plus the standard flue duct may be used together. 2. Flue extensions of greater length than 1m (39") should be supported with the bracket provided, suitably adjusted - refer to Frame 20. 6WDQGDUGIOXH %RLOHU 7HUPLQDOJULOOH Note. Side flue shown BOXER combination boiler - Installation and Servicing 17